151 Front pre-engineered the placement of a structural steel to support the added weight and vibration (now housing 18 generators) in full operation. To facilitate tenant requirements for secondary cooling, a similar structural steel grid was installed on the uppermost roof to accommodate the array of condensers, fluid coolers, glycol pumps, and chillers.